Form Submission Success!! Redirecting in few seconds...

Form Submission Failed!! Please try again!!

In Progress... Please Wait...
File Uploading... Please Wait...
0%

Desalination Plant Registration Online Form Wizard

Step 1: Client Details

 

Client Information

Client Type *:  
 

Contact Person Information

First Name *:  
Middle Name :  
Last Name *:  
Gender *:  
Country :  
ID / PP Number :  
ID / PP Scan Copy :  
Mobile *:  
Email *:  
 

Address Information

Address *:  
Street *:  
Country :  
Island *:  
 

Step 2: General Information

 

1. General Information

Location of the Plant (Island / Resort Name) :  
Area of Plant (site / building) :  
Number of consumers of desalinated water :  
Number of households :  
Population :  
 
Consultant Name *:  
Surveyed By :  
Survey Date :
today
 
 

2. Purpose of Desalination

For free distribution (for locals / staff)
For free distribution (for tourists, expatriates, etc)
For selling water to Locals
For selling water to Tourists, Expatriates, Etc
For industrial use
For own use
 
 

Step 3: Product Details

 

3. Desalination Plant Information

Type of plant :  
Country of Manufacture :  
Manufactured Date :
today
 
Number of plants :  
Plant Serial No :  
Plant Model No :  
Total Capacity (m3) :  
Plant installed by :  
Plant operated by :  
Are the operators technically capable of operating the plant :  
Chemicals used for disinfection :  
Chemicals used for cleaning / maintenance :  
How much chemicals are used :  
How often chemicals are used :  
 

4. Water Intake and Brine Discharge

Type of Intake :
 
Type of Water :  
Location of Intake (Highlight the area on scaled map) :  
Location of th Brine Discharge (Highlight the area on scaled map) :  
Capacity of the raw water collection tank (m3) :  
No. of Boreholes :  
Depth of Borehole :  
Diameter of Borehole :  
Type of housing of the Borehole :  
 
 

5. Type of filter

  No of Filters Micron Size
Sand Filter :
Cartridge Filter :
Bag Filter :
 
 

6. Product Water Storage

Number of tanks :  
Total Capacity :  
Type of tank :  
Type of disinfectant (if any) :  
What are the parameters displayed in the plant meters :  
Has there been any regular testing of water from laboratories :  
In emergencies for how many days stored water can be used :  
Has there been any cross connection in the plumbing :  
 
 

7.1 Ground Water Quality

  Within RO plant facility
  Location - 1 Location - 2 Location - 3 Location - 4
GPS Coordinates
Electrical Conductivity (µS / cm)
Salinity (%)
pH
Temperature (°C)
Oil (Total Hydro Carbon) (mg / l)
 
 

7.2 Product Water Quality

  Reference Storage Tank Main Kitchen Staff Room
pH 6.5 - 8.5
Temperature 23 - 30 °C
Turbidity 0.0 NTU
Electrical Conductivity < 1000 µS / cm
Total Dissolved Solid (TDS) < 500 mg / l
Free Chlorine (if applicable) 0.2 - 0.5 mg / l
Chloride < 200 mg / l
Boron < 0.3 mg / l
Copper < 1 mg / l
Flouride 0.1 - 1.5 mg / l
Iron 0.01 - 0.3 mg / l
Total Hardness (Ca and Mg) < 150 mg / l
Iodine 0.01 - 0.3 mg / l
Nitrates 0.0 mg / l
Nitrite 0.0 mg / l
Ammonia 0.0 mg / l
Phosphate 0.0 mg / l
Sulphate 0.0 mg / l
Sulphite 0.0 mg / l
Total Coliform (cfu / 100ml) 0 / 100 ml
Faecal Coliform (cfu / 100ml) 0 / 100 ml
 
 

7.3 Brine Discharge Location

  Reference Sample 1 Sample 2 Sample 3
GPS Coordinates  
pH 7.5 - 8.5
Temperature 25 - 30 °C
Electrical Conductivity (µS / cm) 35000 - 60000
Salinity (%) 30 - 35 %
Dissolved Oxygen (mg / l) 4 - 6 mg / l
TDS (mg / l) 15000 - 26000
Biological Oxygen Demand (mg / l) < 20
Chemical Oxygen Demand (mg / l) < 20
 
 

7.4 Intake Location (Borehole / Sea)

  Reference Sample 1 Sample 2 Sample 3
GPS Coordinates  
pH 7.5 - 8.5
Temperature 25 - 30 °C
Electrical Conductivity (µS / cm) 35000 - 60000
Salinity (%) 30 - 35 %
Dissolved Oxygen (mg / l) 4 - 6 mg / l
TDS (mg / l) 15000 - 26000
Total Coliform (cfu / 100ml) 0 / 100 ml
Feacal Coliform (cfu / 100ml) 0 / 100 ml
 
 

8. Physical Parameters

  Reference Inside Plant House Outside (within 1 m) Outside (within 5 m)
Noise (dB) < 85 dB
Ocean surface current at brine discharge location  
 
 

9. Water Quality Monitoring

  Yes No Comments (if any)
Does the plant facility maintain RO plant operational and maintenance manuals?
Is there in-house water quality testing facility?
Is there any monitoring plan?
Are there documented previous water quality reports?
 

Step 3: Attachment Details

 

Required Documents

NOTE: Expected file format are as follow; PDF, PNG, JPG & JPEG
Declaration by Proponent *
 
 
Declaration by Consultant *
 
 
Location Map (Minimum A3 size map showing locations of the plant, brine discharge location, intake location and sewerage outfall locations) *
 
 
Photo representation along the brine discharge line and discharge zone within 5m from point of discharge *
 
 
Photo representation at the point of intake within 3m radius *
 
 
Photo representation of desalination plant facility *
 
 
Scanned originals of all laboratory test reports *
 
 
Site specific scaled process flow diagram *
 
 
Proponent commitment letter for future monitoring *
 
 
Previous Water Quality Report (if any) *
 
 
EIA Decision Statement (applicable for new installations) *