Reports
-
-
file_download (Monitoring Report) Gulhifalhu Reclamation Project (Water Quality Report 09th Jan- 15th Jan 2021)
-
file_download (Monitoring Report) Gulhifalhu Reclamation Project (Water Quality Report 02nd Jan- 08nd Jan 2021)
-
file_download (Monitoring Report) Gulhifalhu Reclamation Project (Water Quality Report 19th Dec- 25th Dec 2020)
-
file_download (Monitoring Report) Gulhifalhu Reclamation Project (Water Quality Report 12th Dec- 18th Dec 2020)
-
file_download (Monitoring Report) Gulhifalhu Reclamation Project (Water Quality Report 05th Dec- 11th Dec 2020)
-
file_download (EIA Report 2020) For the proposed Water and Sewerage project in N.Maafaru, Maldives
-
file_download (EIA Report 2020) For the Proposed Development of Water and Sewerage System in ADh,Dhidhoo, Alif Dhaal Atoll,Maldives
-
file_download (EIA Report 2020) For the proposed Development of Water and Sewerage System in Dhevvadhoo, Gaaf Alif Atoll, Maldives
-
file_download (EIA Report 2020) For the Proposed Water and Sewerage Project in HDH.Kumundhoo, Maldives
-
file_download (EMP Report 2020) For the Proposed Construction and Operation od Seaplane Platform in Fiyavalhu Maldives, South Ari Atoll
-
file_download (EIA Report 2020) For the Proposed Development of Water and Sewerage System in Adh.Kunburudhoo,Alif Dhaal Atoll,Maldives
-
file_download (EIA Report 2020) For the Proposed Land Reclamation project at Feeali Islan , Faafu Atoll, Maldives
-
file_download (EIA Report 2020) For the Proposed Water Supply System Development Project in Th.Dhiyamigilli, Maldives
-
file_download (EMP Report 2020) Construction of Presidential Water Villa, Park Hyatt Maldives, Hadahaa, Ga.Atoll
-
file_download (EIA Report 2020) For the Development of Water Supply and Sewerage System in AA.Feridhoo, Maldives
-
Information Officer
Aishath Amjidha (Uza.)
Legal Officer
+960 333 5949