Reports
-
-
file_download (EIA REPORT 2020) Alongside berth Construction at Thilafushi, Kaafu Atoll
-
file_download (EIA REPORT 2020) For Relocation of Powerhouse at HA.Uligam
-
file_download (EIA REPORT 2020) For Relocation of Powerhouse at HDH,Finey
-
file_download (EIA REPORT 2020) For the Proposed resort Development at Giraavaru Falhu, North Male' Atoll
-
file_download (EIA REPORT 2020) For the Proposed resort Development at Giraavaru Falhu, North Male' Atoll
-
file_download (EIA REPORT 2020) For the Proposed resort Development at Giraavaru Falhu, North Male' Atoll
-
file_download (EIA REPORT 2020) For the Proposed resort Development at Giraavaru Falhu, North Male' Atoll
-
file_download (Monitoring Report) Gulhifalhu Reclamation Project (WQR 26th Sep - 2nd Oct 2020)
-
file_download (EMP Reports 2020) EMP for the proposed Installation of Inter- Island Submarine Communication Cable at Rahfalhu Huraa
-
file_download (EIA Reports 2020) EIA for the Proposed Water and Sewerage System in HDh. Kurinbi
-
file_download (Monitoring Report 2020) Gulhifalhu Reclamation Project (WQR 19th - 25th September 2020)
-
file_download (EIA Reports 2020) EIA for the Proposed Asphalting of Roads in Thimarafushi, Thaa Atoll
-
file_download (EMP Report 2020) EMP for the Proposed Renovation & Upgrading Project at Vaagali,South Kaafu Atoll
-
file_download (EIA REPORT 2020) For Proposed Modification of Coastal Protection Structures and Beach Nourishment at grand Park Kodhipparu
-
file_download (EIA REPORT 2020) To the proposed International Hotel in Rasdhoo, Alif Alif Atoll
-
Information Officer
Aishath Amjidha (Uza.)
Legal Officer
+960 333 5949