Reports
-
-
file_download (EIA REPORT 2020) 2nd Addendum to the EIA report Resort Development, Maagau, Dhaalu Atoll, Maldives
-
file_download (EMP REPORT 2020)Proposed Installation and Operation of Seaplane Platform at the Nautilus Maldives, Baa Atoll
-
file_download (EIA REPORT 2020) for the development of Severage System and Water Supply in Narudhoo, Shaviyani Atoll, Maldives
-
file_download (EIA REPORT 2020) for the development of Severage System and Water Supply in Maaungoodhoo, Shaviyani Atoll, Maldives
-
file_download (EIA REPORT 2020) proposed Coastal Protection project at Embudu Village, South Male' Atoll
-
-
file_download (EIA REPORT 2020) For Relocation of Powerhouse at Gdh.Nadella
-
file_download (EMP Report 2020) Proposed Installation and Operation of a seaplane Platform at Reethi Beach Resort maldives, Baa Atoll
-
file_download (EIA REPORTS 2020) Proposed Beach Nourishment and Coastal Protection works at Fihaalhohi Island Resort, South Male' Atoll
-
file_download (Monitoring Report) Gulhifalhu Reclamation Project (Sedimentation report 22 Aug - 8 Sep 2020)
-
file_download (Monitoring Report 2020) Gulhifalhu Reclamation Project (WQR 12th - 18th September 2020)
-
file_download (Monitoring Report 2020) Gulhifalhu Reclamation Project (WQR 5th - 11th September 2020)
-
file_download (Monitoring Report 2020) Gulhifalhu Reclamation Project (WQR 29th August to 4th September July 2020)
-
file_download (EIA Reports 2020) EIA for the Proposed Development of Water supply and Sewerage system Facility at Sh.Narudhoo
-
file_download (EIA Reports 2020) EIA for the proposed development of water supply and sewerage system facility at Sh.Maaungoodhoo
-
Information Officer
Aishath Amjidha (Uza.)
Legal Officer
+960 333 5949